Sunday was the day when the remaining double track between Owego, NY & Waverly was broken down to single track, with track two cut at MP 250.8 and the new signal system activated and tested.
At 1015 the original signal at mp 233 was removed while the new block system was being probed by the maintainers.
NS H88 outlawed early this morning and was left parked at CP Waverly and is still there at 1400.
Train has two units for the Lehigh Railway in tow.
At 1015 the original signal at mp 233 was removed while the new block system was being probed by the maintainers.
NS H88 outlawed early this morning and was left parked at CP Waverly and is still there at 1400.